WP4 – Access to Research Infrastructures for Detectors
Coordinator Marko Mikuž (JSI)
This activity aims at providing TA to various facilities having energetic beams (protons, mesons, muons, electrons) and irradiation facilities in mixed hadron and g fields. These measurements are necessary to study the effect of detectors and associated equipment in-beam, required for the detectors upgrades for operation at the HL-LHC and construction of new detectors for the future.
WP Goals
- Providing transnational access to top level European Research Infrastructures for R&D on HEP detectors
– TA complement to AIDAinnova - Access to RI’s free of charge
– Tailored to detector R&D where dedicated funding is often a problem - Covers 3 types of research infrastructures, grouped into tasks
– Test Beams (3 facilities)
– Detector Characterization (2 facilities)
– Irradiations (6 facilities) - Service Improvements at each RI to improve access
- Research Infrastructures ready to accept EURO-LABS users
- EURO-LABS WP4 shall facilitate Detector R&D in HEP during the next four years
TASKS
Task | Task Name | Subtasks/Activities | Task Leader |
---|---|---|---|
4.1 | Test Beams | 4.1.1 CERN PS and SPS test beams 4.1.2 DESY-II Test beam Facility 4.1.3 PSI PiM1 and UCN test beams |
Eva Barbara Holzer (CERN) |
4.2 | Detector characterization | 4.2.1 RBI-AC, Croatia 4.2.2 ITAINNOVA EMC Lab, Spain |
Fernando Arteche (ITAINNOVA) |
4.3 | Irradiations | 4.3.1 CERN IRRAD, Switzerland 4.3.2 CERN GIF++, Switzerland 4.3.3 JSI TRIGA reactor, Slovenia 4.3.4 IFJ PAN AIC-144 cyclotron, Poland 4.3.5 UCLouvain CRC, Belgium 4.3.6 UoB MC40 Cyclotron, United Kingdom |
Michel Moll (CERN) |
4.4 | Services improvements | Aimed at improving access to RI for EURO-LABS: 4.4.1 Data base handling of beam time and irradiation requests (4.1.1 CERN TB, 4.3.1 IRRAD & 4.3.2 GIF++) 4.4.2 Precision motion stages for large detector setups (4.1.2 DESY test beams) 4.4.3 Beam monitor (4.1.3 PSI test beams) 4.4.4 Ion beam focusing lens (4.2.1 RBI-AF) 4.4.5 Cooling System and Graphical User Interface for EMC test station (4.2.2 ITAinnova) 4.4.6 Beam profile monitor (4.3.1 CERN IRRAD) 4.4.7 Cadmium shielding in the tangential channel (4.3.3 JSI TRIGA) 4.4.8 2-D scanning table for irradiation (4.3.4 IFJ PAN AIC-144) 4.4.9 Test chamber for the heavy ions irradiation facility (4.3.5 UCL CRC) 4.4.10 Scanning system upgrade for high fluence delivery (4.3.6 UoB MC40) |
Marko Mikuž (JSI) |
DELIVERABLES
D# | Task | Deliverable Name | Due date | Leader | Type |
---|---|---|---|---|---|
D4.1 | 4.1,4.2,4.3,4.4 | Report on the usage of Access Units for HEP detector R&D | 30 Jun 2026 | JSI | Report |
D4.2 | 4.4 | Report on the service improvements in WP4.4 | 30 Jun 2026 | JSI | Report |
D4.3 | 4.3 | Report on the usage of Access Units for Irradiations | 30 Jun 2026 | JSI | Report |
D4.4 | 4.4 | Report on the service improvements in RI’s for Detectors | 30 Jun 2026 | JSI | Report |
MILESTONES
MS# | Task | Milestone Name | Delivery date | Leader | Means of verification |
---|---|---|---|---|---|
MS21 | 4.1 | a) More than 30% of AU delivered | 31 Aug 2024 | JSI | AU usage report |
MS22 | 4.2 | b) More than 30% of AU delivered | 31 Aug 2024 | JSI | AU usage report |
MS23 | 4.3 | c) More than 30% of AU delivered | 31 Aug 2024 | JSI | AU usage report |
MS24 | 4.4.1 | Development and test of the first prototype of the system | 31 Aug 2023 | JSI | Report on prototype functionality |
MS25 | 4.4.3 | Prototype and software ready for lab tests | 31 Oct 2023 | JSI | Documentation on software and prototype |
MS26 | 4.4.4 | Electrostatic Microprobe Quadrupole Quadruplet Lens Assembly installed and tested | 31 Dec 2023 | JSI | Installation report |
MS27 | 4.4.5 | Cooling system developed | 29 Feb 2024 | JSI | Documentation on cooling system |
MS28 | 4.4.6 | Upgrade BPM DAQ | 31 Aug 2023 | JSI | Demonstration of BPM DAQ |
MS29 | 4.4.6 | ML-based classification and evaluation of the beam profile patterns | 31 Aug 2024 | JSI | Report on ML classification results |
MS30 | 4.4.7 | Design of the shielding system including safety related aspects | 31 Oct 2023 | JSI | Design and safety documentation |
MS31 | 4.4.8 | Design of the XY table and purchase of materials and equipment for the device | 29 Feb 2024 | JSI | Design documentation |
MS32 | 4.4.9 | Design and commissioning of the beam line (vacuum and test chamber) | 31 Aug 2023 | JSI | Report on design and commissioning |
MS33 | 4.4.10 | Mechanics of the setup adapted to fit into the experimental area | 31 Aug 2024 | JSI | Design documentation |